Skip links

Project :

Jefferson Street, NE – 100-Unit Complex

Project Date:

November 2025

Project Client:

Multi-Family Housing Developer

Project Type:

Foundation Waterproofing

Get a Free Quote

    Project Description

    This foundation is designed for a 100-unit apartment complex. During excavation, a significant amount of water was encountered, necessitating proper management to prevent contamination. For the sheeting and shoring, a geosynthetic clay liner (GCL) was utilized alongside a drain board to effectively manage water and protect the integrity of the foundation.

    Project Summary

    A large apartment project faced water intrusion during excavation. GCL and drain board systems were installed to manage the issue. The solution ensured foundation stability and long-term protection.

    Important Questions About the Project

    It protects the structural base from groundwater infiltration, which can lead to corrosion, cracks, and long-term damage. Proper waterproofing ensures the building's durability from the ground up.

    Common methods include membrane application, liquid coatings, geosynthetic liners, and exterior sealing systems. The choice depends on soil condition, foundation type, and project requirements.

    Yes, but it's more complex and costly. It's always best to apply waterproofing during the construction phase to avoid structural modifications and higher labor expenses later.

    This website uses cookies to improve your web experience.
    See your Privacy Settings to learn more.